Contact US

lf you have any queries, get in touch today! Don't hesitate, We try to take the extra step forour customer satisfaction.

 

Contact Us

  • First Name *

  • Last Name *

  • Email *

  • Message

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

Dongguan Xingcheng Machinery Equipment Co., Ltd. welcomes you!      【+86-158-1765-4546  Miss Zhu】 【+86-138-2884-5503  Mr.Chen】     380052178@qq.com        

图片展示
English
  • English
  • 한국어
  • Français
  • shqiptare
  • عربي
  • አማርኛ
  • আচাম
  • AzerbayjanlıName
  • Eʋegbe
  • Aymara
  • Íris
  • Eesti keel
  • ଓଡିଆ
  • adeta
  • BaskoaName
  • БеларускаяName
  • Bamanankan
  • Български
  • ÍslandName
  • Polski
  • Bosanski
  • فارسی
  • इहो देखल जाय
  • Booleaanse (Afrikaans)
  • Татар
  • Dansk
  • Deutsch
  • Пермь
  • ትግንያውያን
  • डोग्रिड ने दी
  • Русский язык
  • Sanskrit
  • Pilipino
  • suomi
  • Frysk
  • ខ្មែរKCharselect unicode block name
  • ჯორჯიანიName
  • गोंगेन हें नांव
  • ગુજરાતી
  • pem
  • қазақ
  • Kreyòl ayisyen
  • dictionary variant
  • Nederlands
  • Кыргыз тили
  • Galiciano
  • Catalan
  • Čeština
  • ಕನ್ನಡ್Name
  • Histocre
  • a n:n
  • Hrvatska
  • Quechua
  • Zimanê Kurdî
  • Zimanê Kurdî
  • Latina
  • Latvijas
  • ກະຣຸນາ
  • Lietuva
  • Lingala
  • Luganda
  • LëtzebuergeschName
  • Ruwanda
  • română
  • Malagasy
  • Malti

News

Injection molding machine industry trends

Yizumi Electric Injection Molding Machine Operating Instructions

Time: 2025-04-28 13:33:53

Author: Dongguan Xingcheng Machinery Equipment Co., Ltd

Click:

### **1. Safety Protocols**  1. **Personal Protective Equipment (PPE)**     - We

### **1. Safety Protocols**  

1. **Personal Protective Equipment (PPE)**  

   - Wear safety helmets, protective goggles, anti-slip shoes, and gloves.  

   - Avoid loose clothing or accessories.  

2. **Pre-Operation Checks**  

   - Ensure emergency stop buttons are disengaged and the power supply is properly grounded.  

   - Verify hydraulic oil and lubricant levels, and check for leaks in pipelines.  

3. **Hazard Zones**  

   - Never place hands near the mold clamping area or moving injection unit during operation.  

---

### **2. Startup & Initialization**  

1. **Power-Up Sequence**  

   - Turn on the main power supply and activate the Human-Machine Interface (HMI).  

   - Perform a **'Homing'** operation to reset all axes (injection unit, ejector pins, mold).  

2. **Parameter Setup**  

   - Input or load preset parameters (injection pressure, speed, holding time, cooling time, etc.).  

   - Adjust melt temperature based on material type (e.g., ABS: 200–260°C, PC: 280–320°C).  

---

### **3. Mold Installation & Debugging**  

1. **Mold Mounting**  

   - Secure the mold using lifting equipment, ensuring alignment via mold locating rings.  

   - Set clamping force according to the mold’s design specifications (avoid overloading).  

2. **Test Run**  

   - Perform 3–5 empty mold-opening/closing cycles to check for abnormalities.  

   - Conduct a **short-shot test** to verify injection consistency before full production.  

---

### **4. Production Operation**  

1. **Auto Mode**  

   - Confirm all parameters, then switch to automatic mode.  

   - Monitor real-time data (pressure, temperature, cycle time) on the HMI.  

2. **Quality Control**  

   - Regularly sample and inspect products for defects (e.g., sink marks, flash).  

   - Adjust parameters incrementally if deviations occur.  

---

### **5. Shutdown & Maintenance**  

1. **Safe Shutdown**  

   - Switch to manual mode, retract the injection unit, and open the mold fully.  

   - Turn off the heater and allow the machine to cool before cutting the main power.  

2. **Routine Maintenance**  

   - Clean the mold and barrel after each use to prevent material residue.  

   - Lubricate moving parts weekly and replace hydraulic oil annually.  

---

### **Key Warnings**  

- **Never bypass safety sensors or interlocks.**  

- **Immediately press the emergency stop** if abnormal noise, smoke, or vibrations occur.  

- Only trained personnel should service high-voltage components.  

For detailed troubleshooting or advanced settings, consult Yizumi’s technical support or regional service centers.  

*(Note: Specifications may vary by model. Always prioritize guidelines in the official manual.)*


Yizumi Electric Injection Molding Machine Operating Instructions
### **1. Safety Protocols**  1. **Personal Protective Equipment (PPE)**     - We
Long by picture save/share
0

Welcome to leave a message for consultation. We will contact you as soon as we receive the information!

  • First Name *

  • Last Name *

  • Email *

  • Message

  • Submit

  • Security Code
    Refresh the code
    Cancel
    Confirm

    Welcome to leave a message for consultation. We will contact you as soon as we receive the information!

    • First Name *

    • Last Name *

    • Email *

    • Message

  • 提交

  • Security Code
    Refresh the code
    Cancel
    Confirm

    WhatsApp‌

    Product technical consultation

    Xingcheng Machinery Equipment Co., Ltd., Dongguan City, Guangdong Province, China

     

    Address:No. 5 Daxing Road, Nanfang Village, Xiegang Town, Dongguan City, Guangdong Province, China
    Contact:+86-158-1765-4546 Miss Zhu
    Phone: +86-0769-8200-2081                           Email: 380052178@qq.com 
       
                       

     

    WeChat

    Product technical consultation

    Copyright © 2005-2025 Xingcheng Machinery Equipment Co., Ltd., Dongguan City, Guangdong Province, China     网站地图

    Add WeChat friend to learn more about the product
    Use Enterprise WeChat
    "Scan" to join the group chat
    Copy success!
    Add WeChat friend to learn more about the product
    I see.